In DBB, which is typically selected first?

Prepare for the Design-Build Institute of America (DBIA) Exam 1 with our comprehensive study resources. Explore flashcards and multiple choice questions with detailed explanations to ensure success.

Multiple Choice

In DBB, which is typically selected first?

Explanation:
In a DBB project, design and construction are handled as separate contracts. The owner hires the architect-engineer first to develop the complete design and the bid-ready documents. Only after that design is sufficiently defined are bids invited and a general contractor selected based on those bids. This sequencing ensures a defined scope and price for bidding and keeps design and construction activities independent. Choosing the architect-engineer first best reflects how DBB projects are typically procured.

In a DBB project, design and construction are handled as separate contracts. The owner hires the architect-engineer first to develop the complete design and the bid-ready documents. Only after that design is sufficiently defined are bids invited and a general contractor selected based on those bids. This sequencing ensures a defined scope and price for bidding and keeps design and construction activities independent. Choosing the architect-engineer first best reflects how DBB projects are typically procured.

Subscribe

Get the latest from Passetra

You can unsubscribe at any time. Read our privacy policy