Bridging takes considerable what two aspects?

Prepare for the Design-Build Institute of America (DBIA) Exam 1 with our comprehensive study resources. Explore flashcards and multiple choice questions with detailed explanations to ensure success.

Multiple Choice

Bridging takes considerable what two aspects?

Explanation:
Bridging requires additional upfront design effort and coordination to produce bridging documents that define the project at a level between concept and full design. That extra work takes time to complete and adds cost to the project, so the two most significant resources involved are time and expense. While there is some impact on risk and overall effort, the defining overhead of bridging is the extended schedule and the higher upfront design cost needed to create usable bridging documents for bidders and later design-build execution.

Bridging requires additional upfront design effort and coordination to produce bridging documents that define the project at a level between concept and full design. That extra work takes time to complete and adds cost to the project, so the two most significant resources involved are time and expense. While there is some impact on risk and overall effort, the defining overhead of bridging is the extended schedule and the higher upfront design cost needed to create usable bridging documents for bidders and later design-build execution.

Subscribe

Get the latest from Passetra

You can unsubscribe at any time. Read our privacy policy